WO-2001

250h

Step-by-step WO guide ↗

View: mechanic · Roles & financial access

Asset
DEMO-001

Lead / assigned person
Kojo

Planned part
DEMO-LGMG-OF-01 · Engine oil filter · demo stock; Primary fuel filter · demo stock; Engine air filter element · demo stock

Status
completed

Work across several shifts: keep this WO open until the whole task is finished. Each worker ends their own job timer and shift daily; the hours remain on this WO. Planning → stock → work → handover → final closure ↗

Job time — Start job / End job

Signed-in account for this timerDemo Engineer
Time & activities · shift and machine operation →

Start when work begins; end before a break or leaving the job. You can start another work period later. Ending a timer saves the hours; it does not close the WO. The timer continues if you leave this page.

Public demo visitors share the Demo Engineer identity. Use one timer at a time during training.

Recorded job hours: 0.000 · Running periods are excluded until ended.

Parts on this work order

Planned parts and posted consumption are loaded automatically. Mechanics report quantities without prices. Stores reviews reports and posts the stock movements. Pending reports are shown separately; do not report the same parts again.

PartPlannedIssuedReturned to stockNet used
DEMO-LGMG-AF-01
Engine air filter element · demo stock
1000
DEMO-LGMG-FF-01
Primary fuel filter · demo stock
1000
DEMO-LGMG-OF-01
Engine oil filter · demo stock
1000

This WO is closed. Parts and returns are read-only.

Your work records remain on this WO. End your job timer and shift when finished. The WO stays open for the planner or supervisor to review and close later.

WORK PARTY · ON-SITE RECORDS

Work party, SJA & LOTO

The same person can confirm both SJA and LOTO. Select all people working on this WO; additional people can be recorded after work starts. Previous records remain below.

Read SJA / JSA guidance

Generic draft guidance only. Identify the actual task steps and hazards, check the current OEM manual, permits and site rules, and agree on controls, PPE, tools, exclusion zone and emergency response. Brief each participant before recording acknowledgement.

Read LOTO guidance

Generic draft guidance only. Identify all energy sources, isolate and lock each source under the approved site procedure, dissipate stored energy, verify zero energy and record isolation points and personal lock references. Each person controls their own lock.

Keep this form open while reading the guidance above. Follow the current OEM manual and site procedure at the site for DEMO-001. Selecting a person records participation; it does not grant qualifications or system access.

Saved work-party records — earlier entries are retained
ParticipantsSJALOTOOn-site evidenceRecorded by / time
KojoConfirmedConfirmedBreak the work into exact steps and identify every exposed person. Confirm applicable manual warnings, permits and site/workshop HSE rules. Inspect access, ground, lighting, weather, traffic and simultaneous work. Identify stored energy, lifting, pressure, electrical, hot-work and dropped-object hazards. Define controls, PPE, tools, exclusion zone and emergency response. Record site-specific changes and brief every participant. Return to the WO; every work-party member personally acknowledges the SJA before start.Demo Engineer
2026-09-21 09:32:19 UTC

Each signed-in worker can record their own Start job / End job periods on this WO. Several workers may run timers on the same WO; each person can run only one activity at a time.

Back to Olsen Exploration