WO-4003

replace fuel filter

Step-by-step WO guide ↗

View: mechanic · Roles & financial access

Asset
DEMO-001

Lead / assigned person
Kwame

Planned part
DEMO-LGMG-FF-01 · Primary fuel filter · demo stock

Status
in progress

Work across several shifts: keep this WO open until the whole task is finished. Each worker ends their own job timer and shift daily; the hours remain on this WO. Planning → stock → work → handover → final closure ↗

Job time — Start job / End job

Signed-in account for this timerDemo Engineer
Time & activities · shift and machine operation →

Start when work begins; end before a break or leaving the job. You can start another work period later. Ending a timer saves the hours; it does not close the WO. The timer continues if you leave this page.

Public demo visitors share the Demo Engineer identity. Use one timer at a time during training.

Recorded job hours: 0.000 · Running periods are excluded until ended.

Parts on this work order

Planned parts and posted consumption are loaded automatically. Mechanics report quantities without prices. Stores reviews reports and posts the stock movements. Pending reports are shown separately; do not report the same parts again.

PartPlannedIssuedReturned to stockNet used
DEMO-LGMG-FF-01
Primary fuel filter · demo stock
1000
Record planned part: DEMO-LGMG-FF-01 · 1 not yet issued

Available stock: unknown — count stock in Planning first. The suggested quantity comes from the WO plan; reduce it if fewer parts were taken.

Add extra parts used

Unused parts returned to stock — before closing

Report only parts physically returned to stores. Select the original posted issue. Stores must post a pending issue before its unused parts can be returned here. The stock balance changes when stores confirms the return.

No outstanding issued parts available to return. Planned parts that were never issued do not need a stock return.

Your work records remain on this WO. End your job timer and shift when finished. The WO stays open for the planner or supervisor to review and close later.

WORK PARTY · ON-SITE RECORDS

Work party, SJA & LOTO

The same person can confirm both SJA and LOTO. Select all people working on this WO; additional people can be recorded after work starts. Previous records remain below.

Read SJA / JSA guidance

Generic draft guidance only. Identify the actual task steps and hazards, check the current OEM manual, permits and site rules, and agree on controls, PPE, tools, exclusion zone and emergency response. Brief each participant before recording acknowledgement.

Read LOTO guidance

Generic draft guidance only. Identify all energy sources, isolate and lock each source under the approved site procedure, dissipate stored energy, verify zero energy and record isolation points and personal lock references. Each person controls their own lock.

Keep this form open while reading the guidance above. Follow the current OEM manual and site procedure at the site for DEMO-001. Selecting a person records participation; it does not grant qualifications or system access.

Saved work-party records — earlier entries are retained
ParticipantsSJALOTOOn-site evidenceRecorded by / time
KwameConfirmedNot recordedmind sun and mud

SJA: Generic draft guidance only. Identify the actual task steps and hazards, check the current OEM manual, permits and site rules, and agree on controls, PPE, tools, exclusion zone and emergency response. Brief each participant before recording acknowledgement.

Demo Engineer
2026-09-30 10:32:03 UTC

The recorded participants and SJA / LOTO evidence remain on this WO. More people can be added later if the work party changes.

Each signed-in worker can record their own Start job / End job periods on this WO. Several workers may run timers on the same WO; each person can run only one activity at a time.

Back to Olsen Exploration