WO-5004
service 250h
View: mechanic · Roles & financial access
Asset
DEMO-002
Lead / assigned person
Kojo
Planned part
DEMO-LGMG-OF-01 · Engine oil filter · demo stock; Primary fuel filter · demo stock; Engine air filter element · demo stock
Status
in progress
Work across several shifts: keep this WO open until the whole task is finished. Each worker ends their own job timer and shift daily; the hours remain on this WO. Planning → stock → work → handover → final closure ↗
Job time — Start job / End job
Start when work begins; end before a break or leaving the job. You can start another work period later. Ending a timer saves the hours; it does not close the WO. The timer continues if you leave this page.
Public demo visitors share the Demo Engineer identity. Use one timer at a time during training.
Recorded job hours: 0.000 · Running periods are excluded until ended.
Parts on this work order
Planned parts and posted consumption are loaded automatically. Mechanics report quantities without prices. Stores reviews reports and posts the stock movements. Pending reports are shown separately; do not report the same parts again.
| Part | Planned | Issued | Returned to stock | Net used |
|---|---|---|---|---|
| DEMO-LGMG-AF-01 Engine air filter element · demo stock | 1 | 0 | 0 | 0 |
| DEMO-LGMG-FF-01 Primary fuel filter · demo stock | 1 | 0 | 0 | 0 |
| DEMO-LGMG-OF-01 Engine oil filter · demo stock | 1 | 0 | 0 | 0 |
Add extra parts used
Unused parts returned to stock — before closing
Report only parts physically returned to stores. Select the original posted issue. Stores must post a pending issue before its unused parts can be returned here. The stock balance changes when stores confirms the return.
No outstanding issued parts available to return. Planned parts that were never issued do not need a stock return.
Submitted quantities — stores review
| Reported by / date | Part / movement | Quantity | Work note | Status |
|---|---|---|---|---|
| Demo Engineer 2026-09-30 10:38 UTC | DEMO-LGMG-AF-01 · issue | 1 | Planned part issued for work order | Awaiting stores review — not yet posted |
| Demo Engineer 2026-09-30 10:38 UTC | DEMO-LGMG-FF-01 · issue | 1 | Planned part issued for work order | Awaiting stores review — not yet posted |
| Demo Engineer 2026-09-30 10:38 UTC | DEMO-LGMG-OF-01 · issue | 1 | Planned part issued for work order | Awaiting stores review — not yet posted |
Your work records remain on this WO. End your job timer and shift when finished. The WO stays open for the planner or supervisor to review and close later.
Work party, SJA & LOTO
The same person can confirm both SJA and LOTO. Select all people working on this WO; additional people can be recorded after work starts. Previous records remain below.
Keep this form open while reading the guidance above. Follow the current OEM manual and site procedure at the workshop for DEMO-002. Selecting a person records participation; it does not grant qualifications or system access.
| Participants | SJA | LOTO | On-site evidence | Recorded by / time |
|---|---|---|---|---|
| Kojo, Samuel | Confirmed | Confirmed | Beware of thunderstorm SJA: Generic draft guidance only. Identify the actual task steps and hazards, check the current OEM manual, permits and site rules, and agree on controls, PPE, tools, exclusion zone and emergency response. Brief each participant before recording acknowledgement. LOTO: brakes on main power disconnected tray blocked out | Demo Engineer 2026-09-30 10:40:30 UTC |
| Lina | Confirmed | Confirmed | na SJA: na LOTO: na | Demo Engineer 2026-09-30 10:41:31 UTC |
The recorded participants and SJA / LOTO evidence remain on this WO. More people can be added later if the work party changes.
Each signed-in worker can record their own Start job / End job periods on this WO. Several workers may run timers on the same WO; each person can run only one activity at a time.