X-LCC · LIFE-CYCLE COST

X-LCC · Time, costs & performance

Operator & mechanic time

Open Time & activities →

Completed shifts ending within the selected UTC period. 1 open shifts are excluded until ended.

Available hours—
Productive hours—
Time utilisation—
Machine operation · h—
Tool work · h—
Waiting · h—
Travel / administration · h—
Unpaid breaks · h—
Unallocated time · h—

No completed shifts yet. The fields below will fill automatically after Start shift → Start job / activity → End job / activity → End shift. A dash means no recorded data.

Hours by operator / mechanic

Operator / mechanic nameAvailable hoursProductive hoursTime utilisationTool hours*Machine hours*Waiting hoursTravel / admin hoursUnpaid break hoursUnallocated hours
No completed shifts—————————

Available hours = shift duration minus unpaid breaks. Time utilisation = productive hours ÷ available hours. * Tool work and machine operation are included in productive hours, never added twice.

Names identify the signed-in person who recorded the time. Waiting records reflect reported causes; unallocated time is not classified as unproductive.

Recorded operator time by machine

Machine numberOperator hours
No recorded machine operation—

Recorded tool work

Tool name / numberTool-work hours
No recorded tool work—

These are person-recorded activity hours, not measured engine runtime or automatic tool telemetry. Machine availability and output remain in the operational shift records. Activity hours without a WO do not create a labour charge.

FUEL ADDED0 L
UTILISATION0.0%Target 85% · gap -85.0 pt
TONNES MOVED—
METRES DRILLED—

FORECAST · NEXT 30 DAYS

Planned service & machine availability

Fictional example assumptions. Forecast from configured service intervals, recorded meters and expected use. Actual availability and WO costs are shown separately above.

3 / 66machines with rules
147.0 hprojected service stop time
18.1%potential scheduled time impact*

* Planned machine stop hours divided by the expected operating hours of configured machines. Simultaneous tasks on one machine count once per day. It is not actual utilisation or a cost estimate.

Open maintenance schedule →

Performance trends

Charts will appear automatically after the first shift handover is saved. No demo values are shown.

New shift handover

Latest handovers

No shift handovers recorded yet.

WO maintenance costs are shown separately above by currency. Do not enter WO parts again in the shift cost field. Historical shift amounts have no recorded currency and are not combined with WO totals. The 85% utilisation target is an initial adjustable benchmark.
Back to Olsen Exploration